Detailed guide to building a house
Welcome to our guide to building a house! Here you will find detailed instructions, from checking documents at your construction site to finishing the interior of your new home. Our goal is to make the construction process as clear and easy as possible for you.
Preparatory stage
Checking Construction Site Documents
•Ensure that your site has all the necessary documents and permits for building a permanent home.
•Check for any restrictions or special conditions that may affect construction.
Development of an architectural project
•Work with our architect to develop a house plan that perfectly suits the features of your site.
An optimal plan will make the most of the space and consider all your wishes. You can order a project
Obtaining Permits
•Submit our house design to your local architect for approval and to obtain all necessary construction permits.
Construction stages
Geodetic Works:
•After obtaining the permits, contact surveyors to accurately mark out the boundaries of your future house on your site.
Preparing the Construction Site:
•Find a construction company or use our partners to excavate the foundation according to the project and prepare the site for pouring the foundation.
Pouring the Foundation:
•After pouring the foundation, allow the concrete to gain strength over 28 days.
Construction of a house from laminated veneer lumber
Checking construction site Order of a house kit:
•Order the glued laminated timber house kit from our company in advance, as manufacturing a custom order usually takes more than 3-4 weeks.
Delivery
We will organize its delivery to your construction site as soon as possible. By the time the foundation is ready, you will have all the necessary materials.
•Prepare for unloading materials, typically requiring a crane and a crew of 3-4 people.
Assembling the House Frame:
•Use a construction crane to install walls and floors.
Your house will be assembled within a few days according to a special map. •Arrange the timbers so that they are easier to move around the site, each timber will have a special number and row letter.
Final stage
Roofing Works:
• Purchase roofing materials in advance and begin work on installing the roof and installing drainage systems.
• Insulate the roof with mineral wool and line the ceilings with plasterboard or clapboard according to your design.
Installation of windows and doors:
• Install window and door units, following the instructions and design documentation; installing windows in a wooden house requires a special frame and trim around the window; you will find all this included with the house kit.
Installation of communications:
• Invite engineers to install electrical and plumbing, heating and air conditioning systems. All necessary holes for communications will be pre-prepared at the factory, which will simplify the installation process.
Conclusion
Following this step-by-step guide will help you organize the construction of a house from laminated veneer lumber efficiently and without unnecessary hassle. We are always ready to support you at every stage - from design to occupancy.
We accompany you at all stages and help 24/7
If you have any questions or need further assistance, do not hesitate to contact our support team.